skip to Main Content
The Northern Pipeline Interconnector (NPI) – Stage 2

Project Description:

A 48-kilometre, bi-directional water pipeline that, together with the first stage of the pipeline, can transport up to 65 megalitres of water per day either way from the Sunshine Coast to Brisbane.

Back To Top