The Northern Pipeline Interconnector (NPI) – Stage 2
Project Description: A 48-kilometre, bi-directional water pipeline that, together with the first stage of the pipeline, can transport up to 65 megalitres of water per day either way from the Sunshine Coast to Brisbane.
